Mezonic
Mezonic
Grepi Plast
Pavels Innovation
+47 476 60 111 Monday - Friday 09:00 - 17:00 Sandakerveien 138, Oslo 0484
+47 476 60 111 Monday - Friday 09:00 - 17:00 Hydrovegen 19, 3933 Porsgrunn
+47 476 60 111 Monday - Friday 09:00 - 17:00 Hydrovegen 19, 3933 Porsgrunn

Tag

PLUMBING
Drop on the way down into water

New requirements for corrosion safety and drainage capacity

/
SINTEF Byggforsk has new requirements for pipe-in-pipe systems for water supply in homes. The drainage capacity in a manifold cabinet should be at least 0.4 l/s and it should be corrosive. In 2015, Grepi Plast started the development of a manifold cabinet that would be adapted to new requirements in the industry.